• TEL: 0086-13083697781

item 400 excavation and backfill for structures

Get Price

We can supply you need item 400 excavation and backfill for structures.

02220 - Excavation, Backfill and Fill for Structures

EXCAVATION, BACKFILL AND FILL FOR STRUCTURAL FACILITY AND UTILITY SYSTEMS PART 1 - GENERAL 1.01 SCOPE OF WORK:A. The work included under this Section consists of furnishing material and equipment, and performin g al l labor nec ess ary for excav ati ng, bac kf illing, filling and compa cti on of area s to be 2.5 EXCAVATION AND BACKFILL FOR STRUCTURES 2.5 EXCAVATION AND BACKFILL FOR STRUCTURES 2.5.1 Description backfilling of completed structures with suitable material and disposal of excavated material. Pipes and manholes shall be excavated and backfilled in accordance with Sections 6.2 and 6.3. Filling of areas above the natural ground level or above the limits of road excavation or

2014 English Special Provisions to Item 400 - EXCAVATION

2014 English Special Provisions to Item 400 - EXCAVATION AND BACKFILL FOR STRUCTURES (Statewide & Districtwide, Current) PHARR - DISTRICT 21:SP400-001 PDF :RTF - Unless otherwise shown on the plans, the sand backfill shall have 70-100% passing a No. 10 sieve. The plastic Index (PI) as determined by Test Method Tex-106-E shall not exceed 6 2014 English Special Provisions to Item 400 - EXCAVATION 4 rows · Item 400, ''Excavation and Backfill for Structures,'' of the Standard Specifications is amended 204 - EXCAVATION AND BACKFILL FOR STRUCTURES f. Backfill for Structures. (1) General. Do not place backfill against any structure without the Engineers approval. Remove all shoring, bracing and cofferdams before backfilling a structure. Use material from the structure excavation or material from the roadway excavation for the backfill of structures.

204 - EXCAVATION AND BACKFILL FOR STRUCTURES

f. Backfill for Structures. (1) General. Do not place backfill against any structure without the Engineers approval. Remove all shoring, bracing and cofferdams before backfilling a structure. Use material from the structure excavation or material from the roadway excavation for the backfill of structures. 21 Spec - Bid Items206.4000 Excavation for Structures Structural Plate Pipe or Pipe Arches (station) LS 206.5000 Cofferdams (structure) LS 210.2100 Backfill Structure Type B CY 400 Bid Items 405.0100 Coloring Concrete WisDOT Red CY Item 423 Retaining Walls - ftp.dot.state.tx.usItem 132, Embankment Item 400, Excavation and Backfill for Structures Item 420, Concrete Substructures Item 458, Waterproofing Membranes for Structures Item 556, Pipe Underdrains Construct required piling or drilled shafts in accordance with the pertinent specification. 423 4 3.2. Options. When optional design

New Braunfels Utilities Specifications

401 Accepted:12/09/03 Page 1 Structural Excavation and Backfill Item No. 401 Structural Excavation and Backfill 401.1 Description This item shall consist of the excavation for the placing of structures, except pipe sewers, for the disposal of such excavated material and for the backfilling around completed structures to the level of the Standard Specifications for Construction and 400 Items Structures . 400 . Item 400 . Excavation and Backfill for Structures . 1. DESCRIPTION Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. 2. MATERIALS Use materials that meet the requirements of the following Items. Structural Excavation and BackfillStructural Excavation and Backfill . 401.1 Description . This item shall consist of the excavation for the placing of structures, except pipe sewers, for the disposal of such excavated material and for the backfilling around completed structures to the level of the original ground or grade indicated.

Structural Excavation and Backfill

Structural Excavation and Backfill . 401.1 Description . This item shall consist of the excavation for the placing of structures, except pipe sewers, for the disposal of such excavated material and for the backfilling around completed structures to the level of the original ground or grade indicated. TITLE:SUPPORT AND PROTECTION SYSTEMS, 206-1.03 Structure Excavation. The work specified under this item shall include the excavation for all bridge foundations, walls and other major structures a nd backfill of suitable excavated material if another item is not specified. 206-1.04 Conduit Excavation and Backfill. The work specified under this item shall include the TxDOT Specifications - dot.state.tx.usNov 30, 2007 · 8) If Structural Excavation is a pay item, quantities for structural excavation of culvert extensions greater than 15 feet and for all other types of structures not listed in Article 400.5. will be shown on the plans. 9) This is a plans quantity measurement Item. OPTIONAL REQUIREMENTS 1) When flowable backfill is used, it will be measured and

deldot production rates

Item 207000:Excavation and Backfill for Structures Type Project Quantity Range (# of Projects) CY/crewday Sorted by Quantity 0-500 (6) 99 501-1000 (1) 226 1001+ (1) 632 Sorted by Project Type New Align (2) 342 Roadway (2) 204 Bridge (4) 91 Item 208000:Excavation and Backfill for Pipe Trenches Type Project Quantity Range (# of Projects) CY/crewday deldot production ratesItem 207000:Excavation and Backfill for Structures Type Project Quantity Range (# of Projects) CY/crewday Sorted by Quantity 0-500 (6) 99 501-1000 (1) 226 1001+ (1) 632 Sorted by Project Type New Align (2) 342 Roadway (2) 204 Bridge (4) 91 Item 208000:Excavation and Backfill for Pipe Trenches Type Project Quantity Range (# of Projects) CY/crewdayEXCAVATION AND BACKFILL FOR STRUCTURESITEM 400 EXCAVATION AND BACKFILL FOR STRUCTURES 400.1. Description. Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. 400.2. Materials. Use materials that meet the requirements of the following Items: Item 401, Flowable Backfill Item 421, Hydraulic Cement Concrete

Get Price

We can supply you need item 400 excavation and backfill for structures.